7

CLIENT: NIGER DELTA POWER HOLDING COMPANY (NDPHC)

PROJECT: National Integrated Power Project

SCOPE OF WORK: EPC – 330Kv Double Circuit New Haven - Aliade Transmission Line Project (165km).

CONSULTANT: AF Consult Switzerland and LTD/Colenco Consulting Nigeria Ltd

NATURE OF PROJECT: Lump Sum; Turn-Key Contractor in partnership with Dextron Engineering Limited

LOCATION: Nigeria

STATUS: Completed


CLIENT: NIGER DELTA POWER HOLDING COMPANY (NDPHC)

PROJECT: National Integrated Power Project

SCOPE OF WORK: EPC – 330Kv Double Circuit Aliade - Makurdi Transmission Line Project (46km).

CONSULTANT: AF Consult Switzerland and LTD/Colenco Consulting Nigeria Ltd

NATURE OF PROJECT: Lump Sum; Turnkey Contractor in partnership with Dextron Engineering Limited

LOCATION: Nigeria

STATUS: Completed


CLIENT: NIGER DELTA POWER HOLDING COMPANY (NDPHC)

PROJECT: National Integrated Power Project

SCOPE OF WORK: EPC – 330Kv Substation at New Haven Enugu

CONSULTANT: AF Consult Switzerland and LTD/Colenco Consulting Nigeria Ltd

NATURE OF PROJECT: Lump Sum; Turnkey Contractor in partnership with Akay Elektrik of Turkey

LOCATION: Nigeria

STATUS: Completed


CLIENT: POWER HOLDING COMPANY OF NIGERIA Plc (PHCN).

PROJECT: Construction Of Gombe-Yola-Jalingo 330 KV S/C Transmission Line

SCOPE OF WORK: Design, manufacture, construction, supply, and commissioning of Gombe -Ngurore 330KV S/C Transmission line of 198km and Yola-Jalingo S/C Transmission line of 209km.

CONSULTANT: Trans Africa Projects (TAP)/TCN Engineers

NATURE OF PROJECT: Lump Sum; Turnkey EPC Contractor in partnership with Dextron Engineering Limited

LOCATION: Nigeria

STATUS: Completed


CLIENT: Port Harcourt Refining Company (PHRC)

PROJECT: Rehabilitation of Power Plant Steam Boilers 70 B02 & 70 B03 at PortHarcourt Refining Company.

SCOPE OF WORK: Dismantling of boiler casing, removal of air ducts and piping, insulation and a refractory, pressure test and inspection, dismantling of heaters, removal of superheaters, installation of new ones, dismantling of vaporizing banks panels and damaged tubes, extraction of tubes ends from vaporizer drums, preparation of drums bores for expansion, installation, and expansion of new tubes, pressure test, installation of air ducts and piping, restoration of metallic structures, and casing, installation of internals inside the steam drum, installation of burners, boxing up of boiler and civil works.

NATURE OF PROJECT: Lump Sum

LOCATION: Nigeria

STATUS: Completed